Project Roadmap¶
MissionChief UK is maintained as an evidence-led information system rather than a one-off collection of articles.
Core programme status¶
Stages 1–34 are delivered.
62 mission records
46 deployable-resource records
18 infrastructure records
11 qualification records
13 verified mission batches
Static data API v1.0.0
Delivered foundation — Stages 1–12¶
- project identity and information architecture
- player journey and service-guide framework
- vehicle, mission, building, personnel and training models
- planning-tool architecture
- evidence and verification standards
- contribution controls and templates
- Draft 2020-12 schemas and recursive validation
- GitHub Pages delivery through Actions
Delivered operational data — Stages 13–20¶
- Fire and Rescue baseline and resource integrity
- Ambulance and Police alternatives, patients and personnel
- Coastguard, Lifeboat, trailer and ocean-rescue modelling
- Mountain Rescue resources and explicit mission variants
- Search and Rescue HQ, active Drone and missing-person operations
- Bomb Disposal infrastructure and initial mission sequence
- Airfield Operations, airport infrastructure and Code C/F incidents
- Recovery Centres, HGV extensions and structured towing outcomes
Delivered completion programme — Stages 21–34¶
Stage 21 — Railway response¶
- Railway Police and Railway fire response infrastructure
- Road Rail Unit, EIU, BA support, Foam Unit and DSU resources
- Railway Police and command personnel
- passenger, goods and station incidents
- personnel-range semantics
- Railway service guide and Mission Batch 10
Stage 22 — Specialist infrastructure¶
- Police Helicopter Station
- Public Order, Foam, Pump, Flood and Technical Rescue extensions
- Mud Decontamination and Hovercraft extensions
- referential enforcement and infrastructure Batch 2
Stage 23 — Qualifications¶
- production training schema
- eleven verified operational-role records
- qualification template and public catalogue
- explicit separation of verified roles from unverified course details
Stage 24 — Vehicle economics and staffing¶
- structured credit, coin and crew fields
- first official Coastguard economics set
- market-data evidence standard
- comparison-ready export fields
Stage 25 — Bomb Disposal enrichment¶
- busy beach and marina progression
- small and large railway-station incidents
- shed, loft and small building-site incidents
- Mission Batch 11 with directory-level evidence boundaries
Stage 26 — Airfield enrichment¶
- Aircraft Accident Code A and Code D
- Hot Brakes Code D
- Bird Strike and Fuel Leak Code A
- airport maintenance-hangar fire
- Mission Batch 12
Stage 27 — Recovery enrichment¶
- motorbike and motocross recovery
- HGV rollover and hazardous-goods recovery
- bus, caravan and major multi-vehicle variants
- collision between two buses
- Mission Batch 13
Stage 28 — Generated exports¶
- deterministic mission, vehicle, infrastructure and training exports
- version manifest and search index
- validation and deployment integration
Stage 29 — Mission lookup¶
- browser-side mission search and service filtering
- rendered preconditions, patients and requirement classes
Stage 30 — Comparison¶
- deployable-resource comparison
- qualification comparison
- visible unknown-value handling
Stage 31 — Fleet planning¶
- concurrent guaranteed-resource multiplier
- independent alternative-group output
- explicit scope limitations
Stage 32 — Query catalogue¶
- deterministic natural-language keyword matching
- cross-collection generated search index
- no unsupported generative inference
Stage 33 — Generated FAQ¶
- live collection counts
- evidence-policy answers
- Markdown and JSON outputs generated during builds
Stage 34 — Static API¶
- public v1 JSON endpoints
- release versioning and manifest
- OpenAPI 3.1 contract
- API guide and compatibility policy
Ongoing evidence maintenance¶
The numbered core programme is complete. Remaining work is continuous maintenance rather than unfinished architecture:
- reproduce additional vehicle prices, staffing and training durations;
- verify currently unavailable EOD and Recovery response tables;
- add new UK missions and game changes;
- test overlapping alternative-resource dispatch allocation;
- enrich infrastructure cost, capacity and parent-building data;
- maintain API compatibility and publish future versioned releases;
- improve tools when new verified fields support transparent calculations.
Definition of complete¶
A subject is complete only when:
- terminology and aliases are searchable;
- exact values are verified and dated;
- dependencies, alternatives, conditions and overlays are explicit;
- evidence boundaries are stated;
- related documentation and structured records are linked;
- validation covers the relevant relationships;
- a player can act without relying on an unexplained assumption.