Buildings and Extensions Database¶
The production infrastructure database contains 18 schema-controlled records used by verified mission preconditions.
Production location¶
Canonical records¶
| Canonical ID | Name | Kind | Verified mission effect |
|---|---|---|---|
bomb_disposal_hq |
Bomb Disposal HQ | Building | Bomb Disposal generation |
bomb_disposal_marine_unit_extension |
Bomb Disposal Marine Unit Extension | Extension | Coastal Bomb Disposal generation |
hart_base |
HART Base | Building | HART-dependent generation |
aviation_firefighting_extension |
Aviation firefighting Extension | Extension | Airport-firefighting generation |
airfield_operations_extension |
Airfield Operations Extension | Extension | Airfield-operations generation |
mass_casualty_extension |
Mass Casualty Extension | Extension | Mass-casualty generation |
recovery_centre |
Recovery Centre | Building | Recovery missions and variations |
hgv_recovery_extension |
HGV Recovery Extension | Extension | Heavy-vehicle recovery variations |
railway_police |
Railway Police | Building | Railway Police generation |
railway_fire_response |
Railway fire response | Building | Specialist rail-fire generation |
police_helicopter_station |
Police Helicopter Station | Building | Police air-support generation |
police_public_order_extension |
Police Public Order Extension | Extension | Public-order generation |
foam_extension |
Foam Extension | Extension | Foam-dependent generation |
water_damage_pump_extension |
Water Damage Pump Extension | Extension | High-volume pumping generation |
flood_rescue_extension |
Flood Rescue Extension | Extension | Flood-rescue generation |
technical_rescue_extension |
Technical Rescue Extension | Extension | Technical-rescue generation |
mud_decontamination_extension |
Mud Decontamination Extension | Extension | Mud-rescue generation |
hovercraft_extension |
Hovercraft Extension | Extension | Hovercraft-dependent generation |
Referential integrity¶
Mapped mission fields are validated against these canonical IDs. A mission fails validation when it claims a countable specialist precondition without a matching infrastructure record.
Infrastructure is not a dispatched resource¶
A generation precondition does not automatically prove:
- that a vehicle from the building must attend;
- the building's vehicle capacity;
- staffing or classroom capacity;
- purchase price or construction duration;
- whether an extension is active by default.
Examples:
- Mass Casualty Extension is separate from Mass Casualty Equipment.
- Recovery Centre is separate from the number of assets to tow.
- Airfield Operations Extension is separate from Airfield Operations Vehicles.
- Active Drone counts are generation state, not automatically a Drone dispatch row.
Evidence boundary¶
A verified infrastructure record applies only to populated fields. The current catalogue strongly covers identity and mission-generation relationships; many costs, construction times, capacities and parent-building relationships remain controlled evidence targets.
See Specialist Infrastructure Batch 2 for the Stage 22 expansion.