Verified Infrastructure Batch 2 — Specialist Facilities¶
Stage 22 expands the production infrastructure catalogue beyond Bomb Disposal, airport, railway and recovery entities.
Evidence boundary
The current records verify official UK display names and mission-generation relationships. Costs, construction times, capacities and compatible parent buildings remain unpublished unless directly reproduced.
Batch summary¶
| Canonical ID | Name | Kind | Service |
|---|---|---|---|
police_helicopter_station |
Police Helicopter Station | Building | Police |
foam_extension |
Foam Extension | Extension | Fire and Rescue |
water_damage_pump_extension |
Water Damage Pump Extension | Extension | Fire and Rescue |
flood_rescue_extension |
Flood Rescue Extension | Extension | Fire and Rescue |
technical_rescue_extension |
Technical Rescue Extension | Extension | Fire and Rescue |
police_public_order_extension |
Police Public Order Extension | Extension | Police |
mud_decontamination_extension |
Mud Decontamination Extension | Extension | Coastguard |
hovercraft_extension |
Hovercraft Extension | Extension | Coastguard |
Referential integrity¶
Mission fields mapped to these records now fail validation when the corresponding canonical infrastructure entity is absent.
The validated fields are:
police_helicopter_stations
foam_extensions
water_damage_pump_extensions
flood_rescue_extensions
technical_rescue_extensions
police_public_order_extensions
mud_decontamination_extensions
hovercraft_extensions
Interpretation¶
A building or extension count is a mission-generation precondition. It does not, by itself, prove:
- that a particular vehicle must attend;
- how many vehicles the facility stores;
- what personnel it supplies;
- the purchase or construction cost;
- the build duration;
- whether an extension is enabled or disabled by default.
Those attributes remain separate evidence targets.